The Supplemental Restraint System such as "AIR BAG" and "SEAT BELT PRE-TENSIONER", used along with a front seat belt, helps to reduce the risk or severity of injury to the driver and front passenger for certain types of collision. This system includes seat belt switch inputs and dual stage front air bag modules. The SRS system uses the seat belt switches to determine the front air bag deployment, and may only deploy one front air bag, depending on the severity of a collision and whether the front occupants are belted or unbelted.
Information necessary to service the system safely is included in the SR and SB section of this Service Manual.
WARNING:
PRECAUTIONS WHEN USING POWER TOOLS (AIR OR ELECTRIC) AND HAMMERS
WARNING:
- Water soluble dirt:
- Oily dirt:
- Do not use organic solvent such as thinner, benzene, alcohol or gasoline.
- For genuine leather seats, use a genuine leather seat cleaner.
PREPARATION
Special Service Tool
The actual shapes of Kent-Moore tools may differ from those of special service tools illustrated here.
SYSTEM DESCRIPTION
COMPONENT PARTS
NISSAN VEHICLE IMMOBILIZER SYSTEM-NATS
NISSAN VEHICLE IMMOBILIZER SYSTEMNATS : Component Parts Location
1. BCM (view with instrument panel removed) 2. Dongle unit (behind instrument panel LH) 3. Ignition switch 4. NATS antenna amp.
(inside steering column) 5. Clutch interlock switch (M/T models) 6. Combination meter (type B) 7. Security indicator lamp (with type B combination meter) 8. Combination meter (type A) 9. Security indicator lamp (with type A combination meter) 10. Starter relay (integrated within the IPDM E/R) 11. Transmission range switch (CVT or A/T models) 12. Horn
NISSAN VEHICLE IMMOBILIZER SYSTEMNATS
: Component Description
SYSTEM
Removal and Installation REMOVAL 1. Remove the glove box. Refer to IP "Removal and Installation". 2. Remove the remote keyless entry receiver bolt (A). 3. Disconnect the harness connec ...
NISSAN VEHICLE IMMOBILIZER SYSTEMNATS : System Diagram NISSAN VEHICLE IMMOBILIZER SYSTEMNATS : System Description INPUT/OUTPUT SIGNAL CHART BCM &n ...
Power supply and ground circuit
Diagnosis Procedure
1.CHECK GROUND CONNECTION
Turn ignition switch OFF.
Check ground connection E. Refer to Ground Inspection in GI, "Circuit
Inspection".
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair or replace ground connection.
2.CHECK ECM G ...
Diagnosis and repair work flow
Work Flow
OVERALL SEQUENCE
DETAILED FLOW
1.COLLECT INFORMATION FROM THE CUSTOMER
Get detailed information from the customer about the symptom (the condition
and the environment when the
incident/malfunction occurred) using the diagnostic worksheet. Refer to BRC
"Diagnostic Work Sh ...