1.CHECK OPERATION OF METER BUZZER
1. Select BUZZER of BCM(BUZZER) on CONSULT.
2. Perform LIGHT WARN ALM of Active Test.
Does meter buzzer beep?
YES >> Inspection End.
NO >> GO TO 2.
2.CHECK COMBINATION METER INPUT SIGNAL
Select the DATA MONITOR for the METER/MA and check the BUZZER monitor value.
BUZZER
Under the condition of buzzer input : On
Except above : Off
Is the inspection result normal?
YES >> Replace combination meter. Refer to MWI "Removal and Installation" (Type A) or MWI "Removal and Installation" (Type B).
NO >> Replace BCM. Refer to BCS "Removal and Installation" (with Intelligent Key) or BCS "Removal and Installation" (without Intelligent Key).
Regarding Wiring Diagram information, refer to WCS "Wiring Diagram".
1.CHECK POWER SUPPLY OF COMBINATION METER
Check power supply of combination meter. Refer to MWI "COMBINATION METER : Diagnosis Procedure" or MWI "COMBINATION METER : Diagnosis Procedure".
NOTE: To identify combination meter type, refer to MWI "Information".
Is the inspection result normal?
YES >> Inspection End.
NO >> Repair power supply circuit of combination meter.
P0744 Torque converter
Description
This DTC is detected when the torque converter clutch solenoid valve is
electrically normal but the torque converter
clutch does not engage. This is not due to an electrical malfunction (circuit
open or shorted), but is
instead due to a mechanical malfunction (sticking of the cont ...
TCM
Exploded View
1. TCM 2. Bracket 3. Clips
Front
Removal and Installation
NOTE:
When replacing the TCM and transaxle assembly as a set, replace the transaxle
assembly first and then
replace the TCM. Refer to TM, "Description".
REMOVAL
Remove the battery. Refer to PG &q ...