Nissan Versa (N17): Fuel injector

Component Function Check

1.INSPECTION START

Turn ignition switch to START.

Is any cylinder ignited?

YES >> GO TO 2.

NO >> Go to EC, "Diagnosis Procedure".

2.CHECK FUEL INJECTOR FUNCTION

With CONSULT

  1. Start engine.
  2. Perform "POWER BALANCE" in "ACTIVE TEST" mode with CONSULT.
  3. Make sure that each circuit produces a momentary engine speed drop.

Without CONSULT

  1. Let engine idle.
  2. Listen to each fuel injector operating sound.

Clicking noise should be heard.

Is the inspection result normal?

YES >> INSPECTION END

NO >> Go to EC, "Diagnosis Procedure".

CHECK FUEL INJECTOR FUNCTION

Diagnosis Procedure

1.CHECK FUEL INJECTOR POWER SUPPLY CIRCUIT

  1. Turn ignition switch OFF.
  2. Disconnect fuel injector harness connector.
  3. Turn ignition switch ON.
  4. Check the voltage between fuel injector harness connector and ground.   

Is the inspection result normal?

YES >> GO TO 3.

NO >> GO TO 2.

2.DETECT MALFUNCTIONING PART

Check the following.

  • IPDM E/R connector F42
  • 10 A fuse (No. 55)
  • Harness for open or short between fuel injector and fuse

>> Repair open circuit or short to ground or short to power in harness or connectors.

3.CHECK FUEL INJECTOR OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT

  1. Turn ignition switch OFF.
  2. Disconnect ECM harness connector.
  3. Check the continuity between fuel injector harness connector and ECM harness connector.
  4. Also check harness for short to ground and short to power.

Is the inspection result normal?

YES >> GO TO 4.

NO >> Repair open circuit or short to ground or short to power in harness or connectors.

4.CHECK FUEL INJECTOR

Refer to EC, "Component Inspection".

Is the inspection result normal?

YES >> GO TO 5.

NO >> Replace malfunctioning fuel injector. Refer to EM, "Removal and Installation"

5.CHECK INTERMITTENT INCIDENT

Refer to GI, "Intermittent Incident".

Is the inspection result normal?

YES >> Replace IPDM E/R. Refer to PCS, "Removal and Installation" (WITH I-KEY) or PCS, "Removal and Installation" (WITHOUT I-KEY).

NO >> Repair or replace harness or connectors.

Component Inspection

1.CHECK FUEL INJECTOR

  1. Turn ignition switch OFF.
  2. Disconnect fuel injector harness connector.
  3. Check resistance between fuel injector terminals as follows.             

Is the inspection result normal?

YES >> INSPECTION END

NO >> Replace malfunctioning fuel injector. Refer to EM, "Removal and Installation".

Electrical load signal

Description The electrical load signal (Headlamp switch signal, rear window defogger switch signal, etc.) is transferred to ECM through the CAN communication line. ...

Other materials:

Gear oil
Inspection OIL LEAKAGE Make sure that gear oil is not leaking from transaxle or around it. OIL LEVEL Remove filler plug (1) and gasket from transaxle case. Check the oil level from filler plug hole as shown.  CAUTION: Do not start engine while checking oil level. Install a new gas ...

Diagnosis and repair work flow
Work Flow OVERALL SEQUENCE DETAILED FLOW 1.COLLECT INFORMATION FROM THE CUSTOMER Get detailed information from the customer about the symptom (the condition and the environment when the incident/malfunction occurred) using the diagnostic worksheet. Refer to BRC "Diagnostic Work Sh ...