Nissan Versa (N17): Power supply and ground circuit

Nissan Versa 2nd generation (N17) Service Manual / Electrical & power control / Power control system (PCS) / Power supply and ground circuit

Diagnosis Procedure

Regarding Wiring Diagram information, refer to PCS "Wiring Diagram".

1. CHECK FUSE AND FUSIBLE LINKS

Check that the following IPDM E/R fuse or fusible links are not blown.

Is the fuse blown?

YES >> Replace the blown fuse or fusible link after repairing the affected circuit.

NO >> GO TO 2

2. CHECK BATTERY POWER SUPPLY CIRCUIT

1. Turn ignition switch OFF.

2. Disconnect IPDM E/R.

3. Check voltage between IPDM E/R connectors and ground.

Is the measurement value normal?

YES >> GO TO 3

NO >> Repair or replace harness.

3. CHECK GROUND CIRCUIT

1. Turn ignition switch OFF.

2. Check continuity between IPDM E/R connectors and ground.

Does continuity exist?

YES >> Inspection End.

NO >> Repair or replace harness.

REMOVAL AND INSTALLATION

B2099 Ignition relay off stuck

Description The ignition relay integrated in IPDM E/R is operated with ignition switch ON signal from the ignition switch. DTC Logic DTC DETECTION LOGIC Diagnosis Procedure 1. PERFORM SELF ...

IPDM E/R

Removal and Installation CAUTION: IPDM E/R integrated relays are not serviceable parts and must not be removed from the unit. REMOVAL 1. Disconnect the battery negative terminal. Refer to PG-6 ...

Other materials:

Recommended fluids/lubricants and capacities
The following are approximate capacities. The actual refill capacities may be a little different. When refilling, follow the procedure described in the "Do-it-yourself" section to determine the proper refill capacity. ...

Removal and installation
ECM Exploded View 1. ECM bracket 2. ECM  : Vehicle front Removal and Installation CAUTION: Perform ADDITIONAL SERVICE WHEN REPLACING ECM. Refer to EC-122, "Work Procedure". REMOVAL Remove battery. Refer to PG, "Removal and Installation". Remove IPDM E/R. Re ...

Categories


© 2017-2026 Copyright www.niveguide.com
0.0051