Diagnosis Procedure
1.CHECK GROUND CONNECTION
Is the inspection result normal?
YES >> GO TO 2.
NO >> Repair or replace ground connection.
2.CHECK ECM GROUND CIRCUIT FOR OPEN AND SHORT
| ECM | Ground | Continuity | |
| Connector | Terminal | ||
| F10 | 10 | Ground | Existed |
| 11 | |||
| E16 | 108 | ||
3. Also check harness for short to power.
Is the inspection result normal?
YES >> GO TO 4.
NO >> GO TO 3.
3.DETECT MALFUNCTIONING PART
Check the following.
>> Repair open circuit or short to power in harness or connectors.
4.CHECK ECM POWER SUPPLY CIRCUITI
| ECM | Ground | Voltage | |
| Connector | Terminal | ||
| F16 | 93 | Ground | Battery voltage |
Is the inspection result normal?
YES >> GO TO 6.
NO >> GO TO 5.
5.DETECT MALFUNCTIONING PART
Check the following.
>> Repair open circuit or short to ground or short to power in harness or connectors.
6.CHECK ECM POWER SUPPLY CIRCUITII
| ECM | Ground | Voltage | |
| Connector | Terminal | ||
| F16 | 106 | Ground | After turning ignition switch OFF, battery voltage will exist for a few seconds, then drop to approximately 0 V. |
Is the inspection result normal?
YES >> GO TO 7.
NO >> GO TO 9.
7.CHECK ECM POWER SUPPLY CIRCUITIII
| IPDM E/R | Ground | Voltage | |
| Connector | Terminal | ||
| F43 | 50 | Ground | Battery voltage |
Is the inspection result normal?
YES >> GO TO 8.
NO >> Replace IPDM E/R. Refer to PCS, "Removal and Installation" (WITH IKEY) or PCS, "Removal and Installation" (WITHOUT IKEY).
8.CHECK INTERMITTENT INCIDENT
Refer to GI, "Intermittent Incident".
>> INSPECTION END
9.CHECK ECM POWER SUPPLY CIRCUITIV
| ECM | Ground | Voltage | |
| Connector | Terminal | ||
| F10 | 32 | Ground | Battery voltage |
Is the inspection result normal?
YES >> GO TO 13.
NO >> GO TO 10.
10.CHECK ECM POWER SUPPLY CIRCUITV
| ECM | IPDM E/R | Continuity | ||
| Connector | Terminal | Connector | Terminal | |
| F10 | 32 | F43 | 50 | Existed |
4. Also check harness for short to ground and short to power.
Is the inspection result normal?
YES >> GO TO 12.
NO >> GO TO 11.
11.DETECT MALFUNCTIONING PART
Check the following.
>> Repair open circuit or short to ground or short to power in harness or connectors.
12.CHECK 20 A FUSE
Is the inspection result normal?
YES >> GO TO 14.
NO >> Replace 20 A fuse.
13.CHECK ECM POWER SUPPLY CIRCUITVI
| ECM | IPDM E/R | Continuity | ||
| Connector | Terminal | Connector | Terminal | |
| F16 | 105 | F44 | 11 | Existed |
4. Also check harness for short to ground and short to power.
Is the inspection result normal?
YES >> GO TO 14.
NO >> Repair open circuit or short to ground or short power in harness or connectors.
14.CHECK INTERMITTENT INCIDENT
Refer to GI, "Intermittent Incident".
Is the inspection result normal?
YES >> Replace IPDM E/R. Refer to PCS, "Removal and Installation" (WITH IKEY) or PCS, "Removal and Installation" (WITHOUT IKEY).
NO >> Repair or replace harness or connectors.

Description CAN (Controller Area Network) is a serial communication line for real time application. It is an onvehicle multiplex communication line with high data communication speed and excellent ...
S connector circuit
Description
The starter motor magnetic switch is supplied with power when the ignition
switch is turned to the START position
while the selector lever is in the P (Park) or N (Neutral) position.
Diagnosis Procedure
Regarding Wiring Diagram information, refer to STR, "Wiring Diagram - Wit ...
Mainshaft and gear
Exploded View
1. Mainshaft front bearing 2. Mainshaft 3. 1st main gear
4. 1st inner baulk ring 5. 1st synchronizer cone 6. 1st outer baulk ring
7. 1st-2nd synchronizer hub 8. 1st-2nd coupling sleeve 9. Spring
10. Insert key 11. 2nd outer baulk ring 12. 2nd synchronizer cone
13. 2nd inner b ...