Nissan Versa (N17): C1601 Battery power supply

DTC Logic

DTC DETECTION LOGIC   

DTC CONFIRMATION PROCEDURE

1.PRECONDITIONING

If "DTC CONFIRMATION PROCEDURE" has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test.

>> GO TO 2.

2.DTC REPRODUCTION PROCEDURE

With CONSULT

  1. Turn the ignition switch OFF to ON.
  2. Perform "EPS" self-diagnosis.

Is DTC "C1601" detected?

YES >> Proceed to diagnosis procedure. Refer to STC "Diagnosis Procedure".

NO >> Inspection End.

Diagnosis Procedure

Regarding Wiring Diagram information, refer to STC "Wiring Diagram".

1.CHECK EPS CONTROL UNIT GROUND CIRCUIT

  1. Turn ignition switch OFF.
  2. Disconnect EPS control unit harness connector.
  3. Check continuity between EPS control unit harness connector terminal and ground. 
  4. Connect EPS control unit harness connector.

Is the inspection result normal?

YES >> GO TO 2.

NO >> Repair open circuit or short to ground or short to power in harness or connectors.

2.CHECK EPS CONTROL UNIT POWER SUPPLY CIRCUIT (1)

    1.   Check voltage between EPS control unit harness connector terminal and ground.

    2.   Turn ignition switch ON.

CAUTION: Never start the engine.

    3.   Check voltage between EPS control unit harness connector and ground. 

Is the inspection result normal?

YES >> GO TO 4.

NO >> GO TO 3.

3.CHECK EPS CONTROL UNIT POWER SUPPLY CIRCUIT (2)

  1. Turn ignition switch OFF.
  2. Check the 10A fuse (No. 5).
  3. Check the harness for open or short between EPS control unit harness connector M53 terminal 4 and the 10A fuse (No. 5).

Is the inspection result normal?

YES >> Perform the trouble diagnosis for ignition power supply circuit. Refer to PG "Wiring Diagram - Ignition Power Supply -".

NO >> Repair or replace malfunctioning component.

4.CHECK EPS CONTROL UNIT POWER SUPPLY CIRCUIT (3)

  1. Turn ignition switch OFF.
  2. Check voltage between EPS control unit harness connector terminal and ground. 

    3.   Turn ignition switch ON.

CAUTION: Never start the engine.

    4.   Check voltage between EPS control unit harness connector and ground. 

Is the inspection result normal?

YES >> GO TO 6.

NO >> GO TO 5.

5.CHECK EPS CONTROL UNIT POWER SUPPLY CIRCUIT (4)

  1. Turn ignition switch OFF.
  2. Check the 60A fusible link (J).
  3. Check the harness for open or short between EPS control unit harness connector E23 terminal 17 and the 60A fusible link (J).

Is the inspection result normal?

YES >> Perform the trouble diagnosis for power supply circuit. Refer to PG "Wiring Diagram - Battery Power Supply -".

NO >> Repair or replace malfunctioning component.

6.CHECK CONNECTOR

  1. Turn ignition switch OFF.
  2. Disconnect torque sensor harness connector.
  3. Check terminal for deformation, disconnection, looseness, and so on. If any malfunction is found, repair or replace terminal.

Is the inspection result normal?

YES >> Replace EPS control unit. Refer to STC "Removal and Installation".

NO >> Repair or replace malfunctioning component.

Other materials:

Parking brake system
Inspection and Adjustment INSPECTION When parking brake lever is operated with a force of 196 N (20 kg-f, 44 lb-f), make sure parking brake lever stroke is within the specified number of notches. (Check it by listening and counting ratchet clicks.) Number of notches : Refer to PB "Park ...

Steering gear and linkage
Exploded View 1. Guide 2. Cowl seal 3. Steering gear assembly 4. Front suspension member Front Removal and Installation NOTE: When removing components such as hoses, tubes/lines, etc., cap or plug openings to prevent fluid from spilling. REMOVAL Set vehicle to the straight-ahead pos ...