Nissan Versa (N17): IDLE SPEED

Inspection

1.CHECK IDLE SPEED

With CONSULT

Check idle speed in "DATA MONITOR" mode with CONSULT.

Without CONSULT

Check idle speed by installing the pulse type tachometer clamp on the loop wire or on suitable high-tension wire which installed between No.1 ignition coil and No.1 spark plug.

With GST

Check idle speed with Service $01 of GST.

>> INSPECTION END

Normal operating condition

Description FUEL CUT CONTROL (AT NO LOAD AND HIGH ENGINE SPEED) If the engine speed is above 2,400 rpm under no load (for example, the shift lever position is neutral and engine speed is over 2 ...

Ignition timing

Inspection 1.CHECK IGNITION TIMING     1.   Attach timing light (A) to loop wire (1) as shown.     2.   Check ignition timing. 1 : Timing in ...

Other materials:

Control cable
Exploded View 1. Bracket B 2. Lock plate 3. Transaxle assembly 4. Bracket A 5. Control cable 6. CVT shift selector assembly A: Manual lever B: Grommet Removal and Installation CAUTION: Always apply the parking brake before performing removal and installation. REMOVAL Remove the batt ...

Rear suspension beam
Exploded View 1. Rear suspension beam Removal and Installation REMOVAL Remove the wheel and tire assemblies using power tool. Refer to WT "Adjustment". Remove wheel sensor and sensor harness. Refer to BRC "REAR WHEEL SENSOR : Removal and Installation". Re ...

Categories


© 2017-2026 Copyright www.niveguide.com
0.0088