Nissan Versa (N17): Engine cooling system (CO)

Nissan Versa 2nd generation (N17) Service Manual / Engine / Engine cooling system (CO)

Other materials:

Main power supply and ground circuit
Diagnosis Procedure 1.CHECK TCM POWER CIRCUIT (PART 1) Turn ignition switch OFF. Disconnect TCM connector. Check voltage between TCM harness connector terminals and ground.        Is the inspection result normal? YES >> GO TO 2. NO >> G ...

BCM Branch line circuit
Diagnosis Procedure 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors of the BCM for damage, bend and loose connection (unit side and connector side). Is the inspection result normal? YES > ...

Categories


© 2017-2026 Copyright www.niveguide.com
0.0169