Nissan Versa (N17): Power supply and ground circuit

Nissan Versa 2nd generation (N17) Service Manual / Electrical & power control / Body control system (BCS) / Power supply and ground circuit

Diagnosis Procedure

Regarding Wiring Diagram information, refer to BCS "Wiring Diagram".

1.CHECK FUSES AND FUSIBLE LINK

Is the fuse blown?

YES >> Replace the blown fuse or fusible link after repairing the affected circuit.

NO >> GO TO 2.

2.CHECK POWER SUPPLY CIRCUIT

1. Disconnect BCM connector M99.

2. Check voltage between BCM connector M99 and ground.   

Is the inspection result normal?

YES >> GO TO 3.

NO >> Repair harness or connector.

3.CHECK GROUND CIRCUIT

Check continuity between BCM connector M99 and ground.

Is the inspection result normal?

YES >> Inspection End.

NO >> Repair harness or connector.

Combination switch input circuit

Diagnosis Procedure Regarding Wiring Diagram information, refer to BCS "Wiring Diagram". 1.CHECK INPUT 1 - 5 CIRCUIT FOR OPEN 1. Turn ignition switch OFF. 2. Disconnect BCM and combinati ...

Other materials:

Reporting safety defects
For USA If you believe that your vehicle has a defect which could cause a crash or could cause injury or death, you should immediately inform the National Highway Traffic Safety Administration (NHTSA) in addition to notifying NISSAN. If NHTSA receives similar complaints, it may open an inv ...

EVAP control system pressure sensor
Exploded View 1. EVAP control system pressure sensor 2. O-ring 3. EVAP canister Removal and Installation NOTE: The EVAP canister system pressure sensor can be removed without removing the EVAP canister. REMOVAL Remove the EVAP canister protector cover. Disconnect EVAP canister purg ...

Categories


© 2017-2026 Copyright www.niveguide.com
0.0046