Nissan Versa (N17): Power supply and ground circuit

Nissan Versa 2nd generation (N17) Service Manual / Electrical & power control / Body control system (BCS) / Power supply and ground circuit

Diagnosis Procedure

Regarding Wiring Diagram information, refer to BCS "Wiring Diagram".

1.CHECK FUSES AND FUSIBLE LINK

Check that the following fuses and fusible link are not blown.       

Is the fuse blown?

YES >> Replace the blown fuse or fusible link after repairing the affected circuit.

NO >> GO TO 2.

2.CHECK POWER SUPPLY CIRCUIT

1. Turn ignition switch OFF.

2. Disconnect BCM connectors.

3. Check voltage between BCM connector and ground.

Is the inspection result normal?

YES >> GO TO 3.

NO >> Repair harness or connector.

3.CHECK GROUND CIRCUIT

Check continuity between BCM connector and ground.

Is the inspection result normal?

YES >> Inspection End.

NO >> Repair harness or connector.

U1010 Control unit (CAN)

DTC Logic DTC DETECTION LOGIC                    Diagnosis Procedure 1.REPLACE BCM When DTC "U1010 ...

Combination switch input circuit

Diagnosis Procedure Regarding Wiring Diagram information, refer to BCS "Wiring Diagram". 1.CHECK INPUT 1 - 5 CIRCUIT FOR OPEN 1. Turn ignition switch OFF. 2. Disconnect BCM and combina ...

Other materials:

Vehicle Dynamic Control (VDC) system (if so equipped)
The VDC system uses various sensors to monitor driver inputs and vehicle motion. Under certain driving conditions, the VDC System helps to perform the following functions: Controls brake pressure to reduce wheel slip on one slipping drive wheel so power is transferred to a non slipping drive w ...

Stall test
Work Procedure INSPECTION Check the engine oil level. Replenish if necessary. Check for leak of the CVT fluid. Refer to TM "Inspection". Drive for about 10 minutes to warm up the vehicle so that the CVT fluid temperature is 50 to 80C (122 to 176F). Be sure to apply the par ...

Categories


© 2017-2026 Copyright www.niveguide.com
0.005