Exploded View

1. Front suspension member 2. Transverse link
Removal and Installation
REMOVAL
INSPECTION AFTER REMOVAL
Visual Inspection
Check the following:
Ball Joint Inspection
Manually move ball stud to confirm it moves smoothly with no binding.
Swing Torque Inspection
NOTE: Before measurement, move ball stud at least ten times by hand to check for smooth movement.
Tool number : - (J-44372)
Swing torque : Refer to FSU "Ball Joint".
Spring balance measurement : Refer to FSU "Ball Joint".

Axial End Play Inspection
Axial end play : Refer to FSU "Ball Joint".
INSTALLATION
Installation is in the reverse order of removal.
Front coil spring and strutExploded View 1. Strut assembly 2. Coil spring 3. Bound bumper 4. Spring upper seat 5. Strut mounting bearing 6. Piston rod lock nut 7. Strut mounting insulator 8. Stopper insulator 9. Stoppe ...

Exploded View 1. Stabilizer bar 2. Stabilizer clamp 3. Stabilizer bushing 4. Stabilizer connecting rod 5. Strut assembly 6. Front suspension member Front Removal and Installation REMOVAL ...
Service data and specifications
(SDS)
Periodical Maintenance Specification
ENGINE OIL CAPACITY (APPROXIMATE)
  ...
Fuel tank
Exploded View
1. Fuel tank 2. Fuel tank mounting band (RH) 3. Fuel tank mounting band (LH)
4. Clamp 5. Fuel filler hose 6. Fuel filler tube
7. Grommet 8. Fuel filler cap 9. Clamp
10. Vent hose
Removal and Installation
WARNING:
Be sure to read "General Precautions" before working on the fu ...