Inspection
1.CHECK EVAP CANISTER

>> INSPECTION END
Ignition timingInspection 1.CHECK IGNITION TIMING 1. Attach timing light (A) to loop wire (1) as shown. 2. Check ignition timing. 1 : Timing in ...

Inspection CAUTION: Do not use compressed air or a high pressure pump. Do not exceed 4.12 kPa (0.042 kg/cm2, 0.6 psi) of pressure in EVAP system. NOTE: Do not start engine. Improp ...
Main power supply and ground circuit
Diagnosis Procedure
1.CHECK TCM POWER CIRCUIT (PART 1)
Turn ignition switch OFF.
Disconnect TCM connector.
Check voltage between TCM harness connector terminals and ground.
Is the inspection result normal?
YES >> GO TO 2.
NO >> G ...
Diagnosis and repair work flow
Work Flow
NOTE:
The Signal Tech II Tool (J-50190) can be used to perform the following
functions. Refer to the Signal Tech II User Guide for additional information.
Activate and display TPMS transmitter IDs
Display tire pressure reported by the TPMS transmitter
Read TPMS DTCs
Register ...