1.CHECK OPERATION OF METER BUZZER
1. Select BUZZER of BCM(BUZZER) on CONSULT.
2. Perform LIGHT WARN ALM of Active Test.
Does meter buzzer beep?
YES >> Inspection End.
NO >> GO TO 2.
2.CHECK COMBINATION METER INPUT SIGNAL
Select the DATA MONITOR for the METER/MA and check the BUZZER monitor value.
BUZZER
Under the condition of buzzer input : On
Except above : Off
Is the inspection result normal?
YES >> Replace combination meter. Refer to MWI "Removal and Installation" (Type A) or MWI "Removal and Installation" (Type B).
NO >> Replace BCM. Refer to BCS "Removal and Installation" (with Intelligent Key) or BCS "Removal and Installation" (without Intelligent Key).
Regarding Wiring Diagram information, refer to WCS "Wiring Diagram".
1.CHECK POWER SUPPLY OF COMBINATION METER
Check power supply of combination meter. Refer to MWI "COMBINATION METER : Diagnosis Procedure" or MWI "COMBINATION METER : Diagnosis Procedure".
NOTE: To identify combination meter type, refer to MWI "Information".
Is the inspection result normal?
YES >> Inspection End.
NO >> Repair power supply circuit of combination meter.
Evaporative emission system
EVAPORATIVE EMISSION SYSTEM : System Diagram
EVAPORATIVE EMISSION SYSTEM : System
Description
INPUT/OUTPUT SIGNAL CHART
Sensor
Input signal to ECM
ECM function
Actuator
Crankshaft position sensor (POS)
Camshaft position sensor (PHASE)
Engine speed*1
Piston ...
Input shaft and gear
Exploded View
1. Input shaft front bearing 2. Input shaft 3. Snap ring
4. Input shaft rear bearing 5. Adapter plate 6. Bushing
7. 5th input gear 8. 5th-reverse baulk ring 9. Synchronizer lever
10. 5th-reverse synchronizer hub 11. 5th-reverse coupling sleeve 12. Lock washer
13. Retaining pi ...