Nissan Versa (N17): C1601 Battery power supply

DTC Logic

DTC DETECTION LOGIC   

DTC CONFIRMATION PROCEDURE

1.PRECONDITIONING

If "DTC CONFIRMATION PROCEDURE" has been previously conducted, always turn ignition switch OFF and wait at least 10 seconds before conducting the next test.

>> GO TO 2.

2.DTC REPRODUCTION PROCEDURE

With CONSULT

  1. Turn the ignition switch OFF to ON.
  2. Perform "EPS" self-diagnosis.

Is DTC "C1601" detected?

YES >> Proceed to diagnosis procedure. Refer to STC "Diagnosis Procedure".

NO >> Inspection End.

Diagnosis Procedure

Regarding Wiring Diagram information, refer to STC "Wiring Diagram".

1.CHECK EPS CONTROL UNIT GROUND CIRCUIT

  1. Turn ignition switch OFF.
  2. Disconnect EPS control unit harness connector.
  3. Check continuity between EPS control unit harness connector terminal and ground. 
  4. Connect EPS control unit harness connector.

Is the inspection result normal?

YES >> GO TO 2.

NO >> Repair open circuit or short to ground or short to power in harness or connectors.

2.CHECK EPS CONTROL UNIT POWER SUPPLY CIRCUIT (1)

    1.   Check voltage between EPS control unit harness connector terminal and ground.

    2.   Turn ignition switch ON.

CAUTION: Never start the engine.

    3.   Check voltage between EPS control unit harness connector and ground. 

Is the inspection result normal?

YES >> GO TO 4.

NO >> GO TO 3.

3.CHECK EPS CONTROL UNIT POWER SUPPLY CIRCUIT (2)

  1. Turn ignition switch OFF.
  2. Check the 10A fuse (No. 5).
  3. Check the harness for open or short between EPS control unit harness connector M53 terminal 4 and the 10A fuse (No. 5).

Is the inspection result normal?

YES >> Perform the trouble diagnosis for ignition power supply circuit. Refer to PG "Wiring Diagram - Ignition Power Supply -".

NO >> Repair or replace malfunctioning component.

4.CHECK EPS CONTROL UNIT POWER SUPPLY CIRCUIT (3)

  1. Turn ignition switch OFF.
  2. Check voltage between EPS control unit harness connector terminal and ground. 

    3.   Turn ignition switch ON.

CAUTION: Never start the engine.

    4.   Check voltage between EPS control unit harness connector and ground. 

Is the inspection result normal?

YES >> GO TO 6.

NO >> GO TO 5.

5.CHECK EPS CONTROL UNIT POWER SUPPLY CIRCUIT (4)

  1. Turn ignition switch OFF.
  2. Check the 60A fusible link (J).
  3. Check the harness for open or short between EPS control unit harness connector E23 terminal 17 and the 60A fusible link (J).

Is the inspection result normal?

YES >> Perform the trouble diagnosis for power supply circuit. Refer to PG "Wiring Diagram - Battery Power Supply -".

NO >> Repair or replace malfunctioning component.

6.CHECK CONNECTOR

  1. Turn ignition switch OFF.
  2. Disconnect torque sensor harness connector.
  3. Check terminal for deformation, disconnection, looseness, and so on. If any malfunction is found, repair or replace terminal.

Is the inspection result normal?

YES >> Replace EPS control unit. Refer to STC "Removal and Installation".

NO >> Repair or replace malfunctioning component.

Other materials:

Servicing air conditioner
The air conditioner system in your NISSAN vehicle is charged with a refrigerant designed with the environment in mind. This refrigerant does not harm the earth's ozone layer. Special charging equipment and lubricant is required when servicing your NISSAN air conditioner. Using improper ...

How to select piston and bearing
Description Selection points Selection parts Selection items Selection methods Between cylinder block and crankshaft Main bearing Main bearing grade (bearing thickness) Determined by match of cylinder block bearing housing grade (inner diameter of housi ...

Categories


© 2017-2025 Copyright www.niveguide.com
0.0072