1.CHECK OPERATION OF METER BUZZER
1. Select BUZZER of BCM(BUZZER) on CONSULT.
2. Perform LIGHT WARN ALM of Active Test.
Does meter buzzer beep?
YES >> Inspection End.
NO >> GO TO 2.
2.CHECK COMBINATION METER INPUT SIGNAL
Select the DATA MONITOR for the METER/MA and check the BUZZER monitor value.
BUZZER
Under the condition of buzzer input : On
Except above : Off
Is the inspection result normal?
YES >> Replace combination meter. Refer to MWI "Removal and Installation" (Type A) or MWI "Removal and Installation" (Type B).
NO >> Replace BCM. Refer to BCS "Removal and Installation" (with Intelligent Key) or BCS "Removal and Installation" (without Intelligent Key).
Regarding Wiring Diagram information, refer to WCS "Wiring Diagram".
1.CHECK POWER SUPPLY OF COMBINATION METER
Check power supply of combination meter. Refer to MWI "COMBINATION METER : Diagnosis Procedure" or MWI "COMBINATION METER : Diagnosis Procedure".
NOTE: To identify combination meter type, refer to MWI "Information".
Is the inspection result normal?
YES >> Inspection End.
NO >> Repair power supply circuit of combination meter.
Additional service when replacing
transaxle assembly
Description
Perform the following work after the transaxle assembly is replaced.
ERASING AND LOADING OF THE CALIBRATION DATA
The TCM acquires calibration data (individual characteristic value) of
each solenoid that is stored in the
ROM assembly (in the control valve). This enables the TCM ...
ECM Branch line circuit
Diagnosis Procedure
1.CHECK CONNECTOR
1. Turn the ignition switch OFF.
2. Disconnect the battery cable from the negative terminal.
3. Check the terminals and connectors of the ECM for damage, bend and loose
connection (unit side and
connector side).
Is the inspection result normal?
YES > ...