Main power supply and ground circuit
Diagnosis Procedure
1.CHECK TCM POWER CIRCUIT (PART 1)
Turn ignition switch OFF.
Disconnect TCM connector.
Check voltage between TCM harness connector terminals and ground.
Is the inspection result normal?
YES >> GO TO 2.
NO >> G ...
Transmitter wake up operation
Description
This procedure must be performed after replacement of a transmitter or the
BCM, or rotation of the wheels.
Work Procedure
NOTE:
This procedure must be done after replacement of a TPMS transmitter or BCM. New
replacement transmitters
are provided "asleep" and must first ...