Nissan Versa (N17): IDLE SPEED

Inspection

1.CHECK IDLE SPEED

With CONSULT

Check idle speed in "DATA MONITOR" mode with CONSULT.

Without CONSULT

Check idle speed by installing the pulse type tachometer clamp on the loop wire or on suitable high-tension wire which installed between No.1 ignition coil and No.1 spark plug.

With GST

Check idle speed with Service $01 of GST.

>> INSPECTION END

Normal operating condition

Description FUEL CUT CONTROL (AT NO LOAD AND HIGH ENGINE SPEED) If the engine speed is above 2,400 rpm under no load (for example, the shift lever position is neutral and engine speed is over 2 ...

Ignition timing

Inspection 1.CHECK IGNITION TIMING     1.   Attach timing light (A) to loop wire (1) as shown.     2.   Check ignition timing. 1 : Timing in ...

Other materials:

Readiness for inspection/maintenance (I/M) test
Due to legal requirements in some states and Canadian Provinces, your vehicle may be required to be in what is called the "ready condition" for an Inspection/Maintenance (I/M) test of the emission control system. The vehicle is set to the "ready condition" when it is driven through certain d ...

P1212 TCS communication line
Description This CAN communication line is used to control the smooth engine operation during the TCS operation. Pulse signals are exchanged between ECM and "ABS actuator and electric unit (control unit)". Be sure to erase the malfunction information such as DTC not only for "ABS actuat ...

Categories


© 2017-2026 Copyright www.niveguide.com
0.0137