Nissan Versa (N17): Ignition timing

Inspection

1.CHECK IGNITION TIMING

    1.   Attach timing light (A) to loop wire (1) as shown.

CHECK IGNITION TIMING

    2.   Check ignition timing.

1 : Timing indicator

>> INSPECTION END

CHECK IGNITION TIMING

IDLE SPEED

Inspection 1.CHECK IDLE SPEED With CONSULT Check idle speed in "DATA MONITOR" mode with CONSULT. Without CONSULT Check idle speed by installing the pulse type tachometer clamp on the loop wir ...

Evaporative emission system

Inspection 1.CHECK EVAP CANISTER Block port (B). Blow air into port (A) and check that it flows freely out of port (C). Release blocked port (B). Apply vacuum pressure to port (B) and check ...

Other materials:

Performance test
Inspection INSPECTION PROCEDURE Connect recovery/recycling/recharging equipment (for HFC-134a) or manifold gauge. Start the engine, and set to the following condition. Test condition                 &n ...

DLC Branch line circuit
Diagnosis Procedure 1.CHECK CONNECTOR 1. Turn the ignition switch OFF. 2. Disconnect the battery cable from the negative terminal. 3. Check the terminals and connectors of the data link connector for damage, bend and loose connection (connector side and harness side). Is the inspection res ...

Categories


© 2017-2026 Copyright www.niveguide.com
0.0047