Nissan Versa (N17): Push-button ignition switch

Nissan Versa 2nd generation (N17) Service Manual / Electrical & power control / Power control system (PCS) / Push-button ignition switch

Component Function Check

1.CHECK FUNCTION

1. Select "PUSH SW" in "Data Monitor" of BCM with CONSULT.

2. Check the push-button ignition switch signal under the following conditions.

Is the indication normal?

YES >> Inspection End.

NO >> Go to PCS "Diagnosis Procedure".

Diagnosis Procedure

Regarding Wiring Diagram information, refer to PCS "Wiring Diagram".

1. CHECK PUSH-BUTTON IGNITION SWITCH OUTPUT SIGNAL (PUSH-BUTTON IGNITION SWITCH)

1. Turn ignition switch OFF.

2. Disconnect push-button ignition switch connector and IPDM E/R connector E47.

3. Check voltage between push-button ignition switch connector M25 terminal 8 and ground.

Is the inspection result normal?

YES >> GO TO 3.

NO >> GO TO 2.

2. CHECK PUSH-BUTTON IGNITION SWITCH CIRCUIT (BCM)

1. Disconnect BCM connector M98.

2. Check continuity between BCM connector M98 terminal 76 and push-button ignition switch connector M25 terminal 8.               

3. Check continuity between BCM connector M98 terminal 76 and ground.

Is the inspection result normal?

YES >> Replace BCM. Refer to BCS "Removal and Installation".

NO >> Repair or replace harness or connectors.

3. CHECK IGNITION SWITCH OUTPUT SIGNAL (IPDM E/R)

Check voltage between IPDM E/R connector E47 terminal 81 and ground.

Is the inspection result normal?

YES >> GO TO 5.

NO >> GO TO 4.

4. CHECK PUSH-BUTTON IGNITION SWITCH CIRCUIT (IPDM E/R)

1. Disconnect BCM connector M17.

2. Check continuity between IPDM E/R connector E47 terminal 81 and push-button ignition switch connector M25 terminal 8.                   

3. Check continuity between IPDM E/R connector E47 terminal 81 and ground.

Is the inspection result normal?

YES >> Replace IPDM E/R. Refer to PCS"Removal and Installation".

NO >> Repair or replace harness or connectors.

5.CHECK PUSH-BUTTON IGNITION SWITCH GROUND CIRCUIT

Check continuity between push-button ignition switch connector M25 terminal 4 and ground.

Is the inspection result normal?

YES >> GO TO 6.

NO >> Repair or replace harness or connectors.

6.CHECK PUSH-BUTTON IGNITION SWITCH

Refer to PCS "Component Inspection".

Is the inspection result normal?

YES >> Refer to GI"Intermittent Incident".

NO >> Replace push-button ignition switch.

Component Inspection

1.CHECK PUSH-BUTTON IGNITION SWITCH

1. Turn ignition switch OFF.

2. Disconnect push-button ignition switch connector.

3. Check continuity between push-button ignition switch terminals. 

Is the inspection result normal?

YES >> Inspection End.

NO >> Replace push-button ignition switch.

SYMPTOM DIAGNOSIS

Other materials:

Recommended fluids/lubricants and capacities
The following are approximate capacities. The actual refill capacities may be a little different. When refilling, follow the procedure described in the "Do-it-yourself" section to determine the proper refill capacity. ...

Primary speed sensor
Exploded View 1. Transaxle assembly 2. O-ring 3. Primary speed sensor Front : Genuine NISSAN CVT Fluid NS-3 Removal and Installation REMOVAL Remove the front LH wheel and tire. Refer to WT "Adjustment". Remove the LH fender protector. Refer to EXT "Removal and Install ...

Categories


© 2017-2025 Copyright www.niveguide.com
0.0078