Evaporative emission system
Inspection
1.CHECK EVAP CANISTER
Block port (B).
Blow air into port (A) and check that it flows freely out of port (C).
Release blocked port (B).
Apply vacuum pressure to port (B) and check that vacuum pressure
exists at the ports (A) and (C).
Block port (A) and (B).
Apply pressure ...
Door check link
DOOR CHECK LINK : Removal and Installation
REMOVAL
Fully close the front door window.
Remove front door finisher. Refer to INT "Removal and Installation".
Remove front door speaker bolts.
Disconnect harness connector from front door speaker and remove.
Remove door check link ...